Polling place accessibility: St Michael's Anglican Church (Wentworth)

Updated: 18 August 2019


Show:

Premises accessibility (Inspected 12 May 2016)
LocationCriteriaNotesAccessible
05 - Parking
05 - ParkingParking type availableStreetNo
09 - Path of Travel
09 - Path of TravelIs the path lit adequately?No
09 - Path of TravelIs the path 1m wide on straight, 1.5m wide on curves?Yes
09 - Path of TravelIs the path firm and slip resistant?No
09 - Path of TravelIs the path free of cross-fall?No
09 - Path of TravelIs the path free of lips greater than 3mm?No
09 - Path of TravelIs the path free of obstructions?Yes
09 - Path of TravelIs the path free of pot-holes, ridges, overgrowth and debris?Yes
09 - Path of TravelIs the path level?No
09 - Path of TravelIs the path obvious and likely to be used?Yes
10 - Path of Travel Steps
10 - Path of Travel StepsAre the steps constant in rise and tread?Yes
10 - Path of Travel StepsAre the steps in good condition?No
10 - Path of Travel StepsDo the steps have closed risers?Yes
10 - Path of Travel StepsDo the steps have contrasting nosings on each tread?No
10 - Path of Travel StepsDo the steps have secure handrails on both sides?No
10 - Path of Travel StepsNumber of steps60Yes
12 - Building Entrance
12 - Building EntranceDoes the entrance area have adequate lighting?No
12 - Building EntranceIs external undercover queuing available for the entrance?No
12 - Building Entrance - Doorway
12 - Building Entrance - DoorwayDoorway opening width1760 mmYes
12 - Building Entrance - DoorwayIs the doorway/entrance covered and protected from rain?Yes
13 - Entrance Steps
13 - Entrance StepsAre the steps constant in rise and tread?Yes
13 - Entrance StepsAre the steps in good condition?Yes
13 - Entrance StepsDo the steps have closed risers?Yes
13 - Entrance StepsDo the steps have contrasting nosings on each tread?Yes
13 - Entrance StepsDo the steps have secure handrails on both sides?Yes
13 - Entrance StepsNumber of steps8Yes
15 - Entrance corridors
15 - Entrance corridorsAt least 1.2m wide and 1.5x1.5m on corners?Yes
15 - Entrance CorridorsAre the corridors adequately lit?Yes
15 - Entrance CorridorsAre the corridors free of obstructions?Yes
15 - Entrance CorridorsAre the floor surfaces even, carpets firm and/or floorboards secure?Yes
16 - Voting Area Entrance
16 - Voting Area EntranceDoes the entrance area have adequate lighting?No
16 - Voting Area EntranceIs the entrance undercover?Yes
16 - Voting Area Entrance Doorway
16 - Voting Area Entrance DoorwayIs the doorway/entrance covered and protected from rain?Yes
16 - Voting Area Entrance DoorwayWhat is the doorway opening width?1600 mmYes
17 - Voting Area Entrance Steps
17 - Voting Area Entrance StepsAre the steps constant in rise and tread?Yes
17 - Voting Area Entrance StepsAre the steps in good condition?Yes
17 - Voting Area Entrance StepsDo the steps have closed risers?Yes
17 - Voting Area Entrance StepsDo the steps have contrasting nosings on each tread?Yes
17 - Voting Area Entrance StepsDo the steps have secure handrails on both sides?Yes
17 - Voting Area Entrance StepsHow many steps are there?17Yes
19 - Voting Area Entrance Corridors
19 - Voting Area Entrance CorridorsAre the corridors adequately lit?Yes
19 - Voting Area Entrance CorridorsAre the corridors at least 1.2m wide and 1.5x1.5m on corners?Yes
19 - Voting Area Entrance CorridorsAre the corridors free of obstructions?Yes
19 - Voting Area Entrance CorridorsAre the floor surfaces even, carpets firm and/or floorboards secure?Yes
20 - Voting Area
20 - Voting AreaIs the floor surface even? Yes
20 - Voting AreaIs the floor surface slip-resistant?Yes
20 - Voting AreaIs the voting/activity area well lit for purpose?Yes
20 - Voting AreaWill there be at least 1.5 m free circulation space around obstacles?Yes
26 - Premises Amenities
26 - Premises AmenitiesPublic toilet facilities availableMale, FemaleNo
27 - Premises Furniture
27 - Premises FurnitureIs the table suitable for a table-top voting screen?Yes
27 - Premises FurnitureWill a disabled access voting screen be provided? No

This page last updated  08 August 2019